|
Energy Conservation and Environmental Protection Reform Scheme of Zhejiang Hengwei Science and Technology Co., Ltd. (1) Indoor Clean Emission |
|||||||
|
Address: No. 207 Xinguang Avenue, Xinguang Industrial Zone, Liushi Town, Yueqing City, Zhejiang Province Date:2017.05.17 |
|||||||
|
Modification of Smoke Purification in SMT Workshop on the Sixth Floor |
Sales manager |
Ma Ying |
1326238002 |
||||
|
Renovation Project |
Product Name |
Material |
QTY |
Item no. |
Unit Price |
Total |
Remarks |
|
|
Equipment Fume Odor Purifier |
QC-YJ-K2/20 |
4 |
02 |
|
|
First Floor 1-to-2 Design |
|
Equipment Fume Odor Purifier |
QC-YJ-K2/800 |
2 |
01 |
|
|
First Floor 1-to-2 Design |
|
|
Equipment Purifier |
QC-SJ/1500 |
2 |
03 |
|
|
|
|
|
Single-flow inlet fresh air fan |
QC-DF/1100 |
3 |
07 |
|
|
|
|
|
Single-flow outlet fresh air fan |
QC-DF/2200 |
2 |
07 |
|
|
|
|
|
|
UFO Fan |
|
1 |
|
|
|
|
|
|
Pipe Ф20㎝ |
|
30m |
|
|
|
Containing installation |
|
|
Air inlet |
|
17 |
|
|
|
|
|
|
Holes |
|
5 |
|
|
|
|
|
|
Installation wages |
|
6 |
|
|
|
|
|
|
Total |
|
|
|
|
|
|
|
Remarks: 1) The above price includes tax. Including installation. Customers have other requirements, the cost is extra |
|||||||
|
2) Energy saving: total energy consumption of the purifier is 2.1kw/hour |
|||||||
|
3) Installation: easy and convenient, easy to move, easy to use |
|||||||
The problems existing in the workshop on the sixth floor:
Workshop formaldehyde, xylene 11-22.5 times / m3, PM2.5 super national standard 13 times / m3; (national standards: formaldehyde, xylene: 0.1mg / m3; PM2.5: 75mg / m3)Renovation Concept: Renovation of Bad Air in SMT Workshop on the 6th Floor
1. Key pollution sources: 8 stations of solder are directly discharged indoors through the "equipment fume odor purifier", and can also be discharged to the outdoor floor; reflow soldering installation of two "equipment fume odor purifiers" using existing pipelines Outdoor; wave soldering also installs two "equipment purifiers" that use existing pipelines to discharge directly to the outdoors.
I Solder smoke is harmful to the body:
1. Soldering fumes, chemical components of solder paste: formaldehyde, toluene, dicarboxylic acid ester, etc.;
Industry pain point

The formaldehyde exceeds the national standard: 22.5 times, and the PM2.5 exceeds the national standard by 0.5 times;
III Summary:
For the sake of the employees of the workshop, for the sake of reducing energy consumption in their own enterprises, a company wants to reduce pollution for the country. No matter from which considerations, the purification of the workshop is one, a good deed of merit.
Summary
1. When the environmental tax is collected in January 18, we can strive for a "half-half" preferential policy;
2. The fan noise is up to standard (the national standard is 85 decibels during the day and 75 decibels at night).
3. Installed clean emissions to avoid fear of environmental inspections in the future;
4. You can apply for the national subsidy policy for the workshop environment transformation, about 30% of the project transformation amount.
Shanghai Qianchuang Environmental Protection Technology Co., Ltd.
2017/5/17